chore: prepare 1.8.22-alpha release candidate
Demo images / Build & push demo images (push) Failing after 36s
Demo images / Build & push demo images (push) Failing after 36s
This commit is contained in:
@@ -313,3 +313,24 @@ rootless gateway integration now runs the manifest's health check inside the
|
||||
actual image, in addition to endpoint/security/outage/DNS recovery assertions;
|
||||
all passed. A metadata regression covers the address-family requirement. Test
|
||||
containers and their network were removed by the fixture cleanup.
|
||||
|
||||
## 1.8.22-alpha release preparation
|
||||
|
||||
Final implementation gate passed: 1,612 isolated backend tests, zero failures,
|
||||
four existing opt-in tests ignored; 140 frontend files / 1,133 tests; frontend
|
||||
type check and production build; static/catalog/trust/build-context checks.
|
||||
The four exclusions require external AI backends, Reticulum subprocess/live
|
||||
transport, physical RNode hardware, or creation of a live Minibits profile.
|
||||
They are not claimed as executed by the isolated suite. Existing funded
|
||||
Cashu/Minibits and Framework acceptance remains recorded above.
|
||||
|
||||
The real dev Angor stack now returns HTTP 200 fee estimates through both API
|
||||
forms; Bitcoin is still in initial sync, so full-chain completion remains an
|
||||
operational prerequisite rather than a completed test. The image-level health
|
||||
probe, outage/recovery and live native-state preservation checks passed after
|
||||
reloading the corrected manifest. Production Portainer again fetched the exact
|
||||
repository branch and Compose content from its own network namespace.
|
||||
|
||||
Version preparation is 1.8.22-alpha. No new release tag or fleet-visible update
|
||||
manifest is published by the version commit. Optimized candidate deployment,
|
||||
artifact inspection, ISO smoke/boot checks and offline signatures follow.
|
||||
|
||||
Reference in New Issue
Block a user