diff --git a/.planning/STATE.md b/.planning/STATE.md index c1887714..def062ab 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -5,7 +5,7 @@ milestone_name: milestone current_phase: 13 current_phase_name: aiui-functional-conversational-node-control-and-content-surf status: executing -stopped_at: "Completed 13-13-PLAN.md (Routstr backend adapter + D-05 prepaid budget arithmetic ceiling — D-04 chain complete: Ollama -> Claude -> Routstr). Next: 13-14." +stopped_at: "13-14 AT TASK 3 BLOCKING HUMAN-VERIFY GATE 2026-08-06. Tasks 1+2 COMPLETE+pushed (d419141a eighteen cases, 27aa5ccd harness; evals 23/23, crate 1258/1258, zero release-binary footprint). Task 3 = E-02/E-09 comprehension study: NON-TECHNICAL reviewer (not the builder, not a systems person) reads three write dialogs in a scripted 6-action session on archi-dev-box (3 reads must produce zero dialogs), 10s timer each, verbatim answers recorded, >=2/3 correct or FAIL recorded with their words; dialogs verbatim into summary. Node needs CURRENT build+frontend redeploy before the session. Resume-signal: approved + 3 dialog texts + n/3 score. NO SUMMARY yet." last_updated: "2026-08-06T05:40:00.000Z" last_activity: 2026-08-06 last_activity_desc: 13-13 complete (Routstr backend — Nostr discovery, OpenAI chat, Cashu payment via auto_pay_token; AssistantBudget arithmetic ceiling, BudgetExhausted stop, D-04 chain complete)