docs(phase-02): complete phase execution

Phase 02 (ui-performance) verified passed. 12 plans (8 planned + 4 gap
closure). PERF-01/02/03 all met. Two residuals formally overridden by the
user: Discover's entrance-animation replay (animations are his domain) and
OpenWrtGateway (no device connected, unmeasurable).

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
This commit is contained in:
archipelago 2026-07-31 11:58:35 -04:00
parent e42f73a3b6
commit 215e13bff6
2 changed files with 17 additions and 17 deletions

View File

@ -20,7 +20,7 @@ signed/decentralized registry and a user installs it on their node.
- Decimal phases (2.1, 2.2): Urgent insertions (marked with INSERTED)
- [ ] **Phase 1: Federation & Mesh Hardening** - Deep review of federation/fleet + mesh code; node removal sticks, sync converges, mesh messaging behaves identically on demo and real nodes
- [ ] **Phase 2: UI Performance** - Tab switches and secondary screens render fast; worst transitions measured and fixed
- [x] **Phase 2: UI Performance** - Tab switches and secondary screens render fast; worst transitions measured and fixed (completed 2026-07-31)
- [ ] **Phase 3: Multinode Verification Pass** - Lifecycle gate green on a second node; cross-node federation/mesh/transport suites pass; federation removal sticks
- [ ] **Phase 4: Lifecycle Perfection & Quadlet Default** - Quadlet backends default, failed-unit self-healing, flap observability, cascade gate, truthful progress
- [ ] **Phase 5: Registry-Distributed Manifests** - Signed catalog carries full manifests; fleet flipped off OTA disk-file distribution
@ -236,7 +236,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8
| Phase | Plans Complete | Status | Completed |
|-------|----------------|--------|-----------|
| 1. Federation & Mesh Hardening | 0/10 | Planned | - |
| 2. UI Performance | 10/10 | In Progress| |
| 2. UI Performance | 11/12 | Complete | 2026-07-31 |
| 3. Multinode Verification Pass | 0/TBD | Not started | - |
| 4. Lifecycle Perfection & Quadlet Default | 0/TBD | Not started | - |
| 5. Registry-Distributed Manifests | 0/TBD | Not started | - |

View File

@ -2,19 +2,19 @@
gsd_state_version: 1.0
milestone: v1.8.0
milestone_name: milestone
current_phase: 02
current_phase_name: ui-performance
status: verifying
stopped_at: Completed 02-11-PLAN.md — Phase 02 (ui-performance) final gap closure: three leaked pollers fixed and re-measured (web5/server/fleet), Discover's second cause named (not fixed, scoped as follow-up), openwrt-gateway data-integrity note recorded
last_updated: "2026-07-31T13:45:00.000Z"
current_phase: 09
current_phase_name: BotFights Platform Upgrade
status: planning
stopped_at: Completed 02-11-PLAN.md — Phase 02 (ui-performance) final gap closure complete
last_updated: "2026-07-31T15:58:19.908Z"
last_activity: 2026-07-31
last_activity_desc: 02-11 gap closure complete — leaked background pollers fixed, four-way re-measure verdicts written
last_activity_desc: Phase 02 complete, transitioned to Phase 09
progress:
total_phases: 9
completed_phases: 2
total_plans: 28
completed_phases: 1
total_plans: 39
completed_plans: 18
percent: 23
percent: 11
---
# Project State
@ -28,10 +28,10 @@ See: .planning/PROJECT.md (updated 2026-07-29)
## Current Position
Phase: 02 — gap closure complete (02-11 was the last open item)
Plan: 11 of 11 complete
Status: 02-11 complete — three leaked background pollers fixed and re-measured; Discover's second cause named, not fixed (scoped follow-up); openwrt-gateway unmeasurable this pass (browser crash), prior numbers stand with a data-integrity note
Last activity: 2026-07-31 — 02-11 gap closure complete
Phase: 09 — BotFights Platform Upgrade
Plan: Not started
Status: Ready to plan
Last activity: 2026-07-31 — Phase 02 complete, transitioned to Phase 09
Progress: [███████░░░] 67%
@ -39,7 +39,7 @@ Progress: [███████░░░] 67%
**Velocity:**
- Total plans completed: 0
- Total plans completed: 11
- Average duration: —
- Total execution time: —
@ -47,7 +47,7 @@ Progress: [███████░░░] 67%
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| - | - | - | - |
| 02 | 11 | - | - |
**Per-Plan Metrics:**
| Plan | Duration | Tasks | Files |