docs: consolidate release scope and record migration recovery checks

This commit is contained in:
archipelago
2026-09-30 10:52:41 -04:00
parent acf544500f
commit 7c4169867c
4 changed files with 35 additions and 12 deletions
+7 -8
View File
@@ -6,8 +6,8 @@ Reviewed both open PRs from the repository pull-request list: [#161](https://sou
and [#162](https://source.archipelago-foundation.org/lfg2025/archy/pulls/162).
Both branches were updated from main, repaired and tested independently and
together. Their existing remote branches were advanced without rewriting the
contributors' history. They remain open for integration into the release after
1.8.21; no reviewed code was merged into main or deployed to a live wallet.
contributors' history. Both were subsequently merged and closed and are now
integrated on main. Candidate live-wallet acceptance remains pending.
The signed 1.8.21 artifacts are unchanged.
| Candidate | Tested commit | Isolated backend result |
@@ -95,8 +95,8 @@ Logs on the development box:
## Next-release acceptance and limits
- Integrate the reviewed branches and repeat the release gates against the
final release commit if additional code changes land.
- Both reviewed branches are integrated on main alongside the lifecycle fixes.
Repeat release gates against the final release commit after remaining changes.
- Perform funded peer-to-peer acceptance on the candidate build, including a
Tor-only purchase and a purchase requiring change, before the next release.
The new review branches were not deployed to funded live wallets here.
@@ -109,8 +109,8 @@ Logs on the development box:
ordinary write failures and truncated input are tested to clean up. The final
filename is published only after complete input, and existing files remain
protected.
- The separately reported X250 kiosk version-selector rendering issue remains
open in `TODO.md` and requires validation on the actual kiosk.
- The separately reported X250 kiosk selector is fixed and verified on the
actual kiosk; see the lifecycle evidence and consolidated release checklist.
## Authorized merge — 2026-09-30
@@ -122,6 +122,5 @@ Gitea normal merges completed and read-back confirmed `merged=true`, `state=clos
- #161: `3daea6623be3e2c7222101b8e6ac411423c7e16c`.
- #162: `b02ba4100d922dd1b75c6a78121ef446c2159a54`.
Local next-release lifecycle work will be integrated with this main before the
next release. Funded release acceptance and the documented delivery-receipt
Local next-release lifecycle work was integrated with main at `d69e8452`. Funded release acceptance and the documented delivery-receipt
limitation remain as recorded above; merging does not claim a new release.