docs: record live lifecycle acceptance and next release blockers
This commit is contained in:
+41
-14
@@ -14,6 +14,39 @@ doc. See [`ROADMAP.md`](ROADMAP.md) for the curated, public-facing direction.
|
||||
|
||||
## Next release after 1.8.21 — reported 2026-09-30
|
||||
|
||||
- [ ] **Release blocker: Gitea → Portainer repository integration.** Diagnose
|
||||
smart-HTTP reachability from Portainer's actual request namespace, then provide
|
||||
one declarative topology and idempotent migration for fresh installs and
|
||||
existing nodes. Preserve gate/auth boundaries, operator configuration,
|
||||
repository/key/database mounts and Portainer stacks. Cover install order,
|
||||
lifecycle/reboot/update convergence, clone/push and source-branch/Compose-file
|
||||
acceptance with a disposable integration setup. Ship in both OTA and ISO;
|
||||
a healthy Gitea root page is insufficient. Operator supplied a private handover;
|
||||
deployment addresses and credentials must not be committed.
|
||||
|
||||
- [ ] **New X250: GitWorkshop failed at 70%; slow Nginx installation.** Missing
|
||||
ISO build contexts restored on-node; package staging/smoke checks added.
|
||||
GitWorkshop dependency audit refreshed and build/HTTP recovery verified;
|
||||
Nginx was a slow successful image pull. Aggregate progress label corrected.
|
||||
Include the validated repair in the next OTA/ISO. See lifecycle evidence.
|
||||
|
||||
- [ ] **Angor indexer service in the app store**, requested after the other
|
||||
current repair/review work (2026-09-30). Follow the repository's app-development
|
||||
and packaging documentation; treat it as a headless service unless upstream
|
||||
documentation establishes a UI. Verify Bitcoin/Mempool requirements, decide
|
||||
whether an existing first-class relay meets Angor's requirements or a relay
|
||||
must be packaged with the indexer, and use the Angor logo from angor.io for its
|
||||
service icon. The mentioned setup-documentation link was not included; asked
|
||||
the operator for it. Include this service in the next-release scope.
|
||||
|
||||
- [ ] **App lifecycle: keep installed apps visible through restart and hard
|
||||
refresh; gate embedded/browser launches on actual web and listener readiness.**
|
||||
Source repair and scoped live acceptance passed; full release gate pending.
|
||||
Includes durable inventory reconstruction,
|
||||
concurrent inventory writes, stale scan/lifecycle updates, delayed HTTP startup,
|
||||
and the app gate's post-install listener delay. See
|
||||
[app lifecycle repair evidence](app-lifecycle-repair-20260930.md).
|
||||
|
||||
- [x] Review and repair open paid-download PRs #161 and #162, refresh both
|
||||
branches from main, run independent and combined isolated suites, and verify
|
||||
rootless file permissions in disposable scratch storage. Combined result:
|
||||
@@ -21,23 +54,17 @@ doc. See [`ROADMAP.md`](ROADMAP.md) for the curated, public-facing direction.
|
||||
[review evidence and remaining acceptance work](pr-review-20260930.md).
|
||||
- [ ] Integrate the reviewed PR branches into the next release and run funded
|
||||
candidate acceptance, including Tor-only transport and payments with change.
|
||||
PRs remain open; the reviewed code has not been deployed to live wallets.
|
||||
Operator authorized completing the normal merge/closure workflow on
|
||||
2026-09-30. Both PRs are now merged and closed through Gitea; integrate
|
||||
local repair commits and sync git/ngit before release. The reviewed code has not yet been deployed to live wallets.
|
||||
- [ ] Design durable recovery for an accepted payment whose response is lost.
|
||||
Preserve the truthful unconfirmed-refund warning and prevent automatic
|
||||
duplicate payment while that recovery work is outstanding.
|
||||
- [ ] **ThinkPad X250 kiosk: Bitcoin installation version selector is unreadable
|
||||
and appears underneath the pruning information.** Operator reports white
|
||||
styling with invisible text on the actual kiosk; the same flow works in remote
|
||||
Brave. Reproduce on the X250's kiosk engine and record its version, display
|
||||
scale and resolution. Inspect the native `<select>` in
|
||||
`neode-ui/src/components/InstallVersionModal.vue`, its option colors, and the
|
||||
scroll/stacking behavior in `BaseModal.vue`; these are investigation leads,
|
||||
not a confirmed cause. Fix contrast and popup visibility without changing
|
||||
version selection or pruning behavior. Validate Core and Knots, open/closed
|
||||
and scrolled dropdowns, keyboard/touch selection, and pruning on/off on the
|
||||
actual kiosk, with remote Brave and mobile regression checks. Browser mocks
|
||||
alone do not establish that the kiosk rendering is fixed. Track for the next
|
||||
release; the signed 1.8.21 artifacts remain unchanged.
|
||||
- [x] **ThinkPad X250 kiosk: Bitcoin version choices readable above pruning.**
|
||||
Replaced the native popup with inline radio choices. Actual Chromium 152 kiosk
|
||||
assertions and screenshot verify white-on-dark choices, selection changes and
|
||||
layout above pruning controls. Focused component tests pass. Included in the
|
||||
next-release source; published 1.8.21 artifacts remain unchanged.
|
||||
|
||||
## 1.8.21 repair and release tasks — completed 2026-09-30
|
||||
|
||||
|
||||
Reference in New Issue
Block a user