--- gsd_state_version: '1.0' status: planning progress: total_phases: 8 completed_phases: 0 total_plans: 0 completed_plans: 0 percent: 0 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-07-29) **Core value:** A third-party developer can publish an app via the signed/decentralized registry and a user can install it on their node — manifest-driven, rootless, secure, robust. **Current focus:** Phase 1 — Federation & Mesh Hardening ## Current Position Phase: 1 of 8 (Federation & Mesh Hardening) Plan: 0 of TBD in current phase Status: Ready to plan Last activity: 2026-07-29 — Completed quick task 260729-fw7: mesh hop graphic redesign (branded HopVizModal, vertical mobile layout) Progress: [░░░░░░░░░░] 0% ## Performance Metrics **Velocity:** - Total plans completed: 0 - Average duration: — - Total execution time: — **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | - | - | - | - | ## Accumulated Context ### Roadmap Evolution - Phase 1 added (2026-07-29): Federation & Mesh Hardening — user-directed top priority (node removal/sync issues, mesh attachment parity incl. demo); prior phases shifted down - Phase 2 added (2026-07-29): UI Performance — slow tab switches and secondary screens; prior phases shifted down - FED-05 added to Phase 1 (2026-07-29): inter-node Lightning channel-opening UX (share node URI, pick trusted/federated nodes by hostname, request channels with public nodes); UI tested on :8100 dev preview against archi-dev before deploy - FED-06 added to Phase 1 (2026-07-29): on-brand paid-tick animation — screensaver ring + EQ segments (reuse ScreensaverRing.vue compact) replacing the success burst in SendBitcoinModal.vue ### Decisions Decisions are logged in PROJECT.md (10 locked ADRs in the `` block + milestone decisions table). Recent decisions affecting current work: - Milestone version = 1.8.0-alpha (decided 2026-07-08) - Phase-3 Quadlet default-flip is gated on the second-node gate reporting clean (do fresh, never stage uncommitted) - Workstream D (DHT distribution) deferred to v2 — design-only backlog - Canonical manifest schema = `core/container/src/manifest.rs` (code wins over spec doc) ### Pending Todos None yet. ### Blockers/Concerns - [Phase 1] Federation tombstone fix touches trust code — fix carefully, re-verify with `tests/multinode/smoke.sh`, don't patch blind - [Phase 3] Multinode gate on archy-x250-beta was launched 2026-07-01 (log on-node); verify outcome before re-running - [Phase 5] Fleet registry flip awaits explicit user authorization + timing call - [Phase 6] Strengthened ADR-009 validation may reject existing catalog apps — audit manifests before enforcement lands - [Global] Live OTA fleet: deploy to the dev pair before any OTA; gate re-runs required after orchestrator changes; some verification is user/hardware-gated (radios, on-device tests) ### Quick Tasks Completed | # | Description | Date | Commit | Directory | |---|-------------|------|--------|-----------| | 260729-fw7 | improve mesh message hop graphic/animation: balanced desktop sizing, vertical mobile layout, archipelago branding | 2026-07-29 | ac09fc5d | [260729-fw7-improve-mesh-message-hop-graphic-animati](./quick/260729-fw7-improve-mesh-message-hop-graphic-animati/) | ## Deferred Items | Category | Item | Status | Deferred At | |----------|------|--------|-------------| | Distribution | DIST-01 DHT/iroh backbone (workstream D) | v2 | 2026-07-29 | | Fleet | FLEET-01 Bitcoin multi-version fleet OTA (user-gated) | v2 | 2026-07-29 | | Fleet | FLEET-02 per-app deep health assertions (~34 apps) | v2 | 2026-07-29 | | Fleet | FLEET-03 LUKS2 data-partition encryption | v2 | 2026-07-29 | ## Session Continuity Last session: 2026-07-29 Stopped at: Roadmap + state initialized from ingest; next step is `/gsd-plan-phase 1` Resume file: None