# Requirements (from PRDs) No PRD documents were present in the ingest set (10 ADRs + 1 SPEC). No requirements extracted. Downstream note: requirements for the roadmap must be derived elsewhere (e.g. from user input or a future PRD ingest); this file intentionally records absence rather than inferring requirements from ADR/SPEC content.