Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-07-29)

Core value: A third-party developer can publish an app via the signed/decentralized registry and a user can install it on their node — manifest-driven, rootless, secure, robust. Current focus: Phase 1 — Multinode Verification Pass

Current Position

Phase: 1 of 6 (Multinode Verification Pass) Plan: 0 of TBD in current phase Status: Ready to plan Last activity: 2026-07-29 — Project initialized from doc ingest (10 ADRs + 1 SPEC) + codebase map; roadmap created (6 phases, 20 requirements, 100% coverage)

Progress: [░░░░░░░░░░] 0%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: —
  • Total execution time: —

By Phase:

Phase Plans Total Avg/Plan
- - - -

Accumulated Context

Decisions

Decisions are logged in PROJECT.md (10 locked ADRs in the <decisions> block + milestone decisions table). Recent decisions affecting current work:

  • Milestone version = 1.8.0-alpha (decided 2026-07-08)
  • Phase-3 Quadlet default-flip is gated on the second-node gate reporting clean (do fresh, never stage uncommitted)
  • Workstream D (DHT distribution) deferred to v2 — design-only backlog
  • Canonical manifest schema = core/container/src/manifest.rs (code wins over spec doc)

Pending Todos

None yet.

Blockers/Concerns

  • [Phase 1] Multinode gate on archy-x250-beta was launched 2026-07-01 (log on-node); verify outcome before re-running
  • [Phase 1] Federation tombstone fix touches trust code — fix carefully, re-verify with tests/multinode/smoke.sh, don't patch blind
  • [Phase 3] Fleet registry flip awaits explicit user authorization + timing call
  • [Phase 4] Strengthened ADR-009 validation may reject existing catalog apps — audit manifests before enforcement lands
  • [Global] Live OTA fleet: deploy to the dev pair before any OTA; gate re-runs required after orchestrator changes; some verification is user/hardware-gated (radios, on-device tests)

Deferred Items

Category Item Status Deferred At
Distribution DIST-01 DHT/iroh backbone (workstream D) v2 2026-07-29
Fleet FLEET-01 Bitcoin multi-version fleet OTA (user-gated) v2 2026-07-29
Fleet FLEET-02 per-app deep health assertions (~34 apps) v2 2026-07-29
Fleet FLEET-03 LUKS2 data-partition encryption v2 2026-07-29

Session Continuity

Last session: 2026-07-29 Stopped at: Roadmap + state initialized from ingest; next step is /gsd-plan-phase 1 Resume file: None