3.9 KiB
gsd_state_version, status, progress
| gsd_state_version | status | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | planning |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-07-29)
Core value: A third-party developer can publish an app via the signed/decentralized registry and a user can install it on their node — manifest-driven, rootless, secure, robust. Current focus: Phase 1 — Federation & Mesh Hardening
Current Position
Phase: 1 of 8 (Federation & Mesh Hardening) Plan: 0 of TBD in current phase Status: Ready to plan Last activity: 2026-07-29 — Completed quick task 260729-fw7: mesh hop graphic redesign (branded HopVizModal, vertical mobile layout)
Progress: [░░░░░░░░░░] 0%
Performance Metrics
Velocity:
- Total plans completed: 0
- Average duration: —
- Total execution time: —
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| - | - | - | - |
Accumulated Context
Roadmap Evolution
- Phase 1 added (2026-07-29): Federation & Mesh Hardening — user-directed top priority (node removal/sync issues, mesh attachment parity incl. demo); prior phases shifted down
- Phase 2 added (2026-07-29): UI Performance — slow tab switches and secondary screens; prior phases shifted down
- FED-05 added to Phase 1 (2026-07-29): inter-node Lightning channel-opening UX (share node URI, pick trusted/federated nodes by hostname, request channels with public nodes); UI tested on :8100 dev preview against archi-dev before deploy
- FED-06 added to Phase 1 (2026-07-29): on-brand paid-tick animation — screensaver ring + EQ segments (reuse ScreensaverRing.vue compact) replacing the success burst in SendBitcoinModal.vue
Decisions
Decisions are logged in PROJECT.md (10 locked ADRs in the <decisions> block + milestone decisions table). Recent decisions affecting current work:
- Milestone version = 1.8.0-alpha (decided 2026-07-08)
- Phase-3 Quadlet default-flip is gated on the second-node gate reporting clean (do fresh, never stage uncommitted)
- Workstream D (DHT distribution) deferred to v2 — design-only backlog
- Canonical manifest schema =
core/container/src/manifest.rs(code wins over spec doc)
Pending Todos
None yet.
Blockers/Concerns
- [Phase 1] Federation tombstone fix touches trust code — fix carefully, re-verify with
tests/multinode/smoke.sh, don't patch blind - [Phase 3] Multinode gate on archy-x250-beta was launched 2026-07-01 (log on-node); verify outcome before re-running
- [Phase 5] Fleet registry flip awaits explicit user authorization + timing call
- [Phase 6] Strengthened ADR-009 validation may reject existing catalog apps — audit manifests before enforcement lands
- [Global] Live OTA fleet: deploy to the dev pair before any OTA; gate re-runs required after orchestrator changes; some verification is user/hardware-gated (radios, on-device tests)
Quick Tasks Completed
| # | Description | Date | Commit | Directory |
|---|---|---|---|---|
| 260729-fw7 | improve mesh message hop graphic/animation: balanced desktop sizing, vertical mobile layout, archipelago branding | 2026-07-29 | ac09fc5d |
260729-fw7-improve-mesh-message-hop-graphic-animati |
Deferred Items
| Category | Item | Status | Deferred At |
|---|---|---|---|
| Distribution | DIST-01 DHT/iroh backbone (workstream D) | v2 | 2026-07-29 |
| Fleet | FLEET-01 Bitcoin multi-version fleet OTA (user-gated) | v2 | 2026-07-29 |
| Fleet | FLEET-02 per-app deep health assertions (~34 apps) | v2 | 2026-07-29 |
| Fleet | FLEET-03 LUKS2 data-partition encryption | v2 | 2026-07-29 |
Session Continuity
Last session: 2026-07-29
Stopped at: Roadmap + state initialized from ingest; next step is /gsd-plan-phase 1
Resume file: None