archy/.planning/STATE.md

3.5 KiB
Raw Blame History

gsd_state_version, status, progress
gsd_state_version status progress
1.0 planning
total_phases completed_phases total_plans completed_plans percent
8 0 0 0 0

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-07-29)

Core value: A third-party developer can publish an app via the signed/decentralized registry and a user can install it on their node — manifest-driven, rootless, secure, robust. Current focus: Phase 1 — Federation & Mesh Hardening

Current Position

Phase: 1 of 8 (Federation & Mesh Hardening) Plan: 0 of TBD in current phase Status: Ready to plan Last activity: 2026-07-29 — Inserted Phase 1 (Federation & Mesh Hardening) and Phase 2 (UI Performance) per user priority; prior phases renumbered 38

Progress: [░░░░░░░░░░] 0%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: —
  • Total execution time: —

By Phase:

Phase Plans Total Avg/Plan
- - - -

Accumulated Context

Roadmap Evolution

  • Phase 1 added (2026-07-29): Federation & Mesh Hardening — user-directed top priority (node removal/sync issues, mesh attachment parity incl. demo); prior phases shifted down
  • Phase 2 added (2026-07-29): UI Performance — slow tab switches and secondary screens; prior phases shifted down
  • FED-05 added to Phase 1 (2026-07-29): inter-node Lightning channel-opening UX (share node URI, pick trusted/federated nodes by hostname, request channels with public nodes); UI tested on :8100 dev preview against archi-dev before deploy
  • FED-06 added to Phase 1 (2026-07-29): on-brand paid-tick animation — screensaver ring + EQ segments (reuse ScreensaverRing.vue compact) replacing the success burst in SendBitcoinModal.vue

Decisions

Decisions are logged in PROJECT.md (10 locked ADRs in the <decisions> block + milestone decisions table). Recent decisions affecting current work:

  • Milestone version = 1.8.0-alpha (decided 2026-07-08)
  • Phase-3 Quadlet default-flip is gated on the second-node gate reporting clean (do fresh, never stage uncommitted)
  • Workstream D (DHT distribution) deferred to v2 — design-only backlog
  • Canonical manifest schema = core/container/src/manifest.rs (code wins over spec doc)

Pending Todos

None yet.

Blockers/Concerns

  • [Phase 1] Federation tombstone fix touches trust code — fix carefully, re-verify with tests/multinode/smoke.sh, don't patch blind
  • [Phase 3] Multinode gate on archy-x250-beta was launched 2026-07-01 (log on-node); verify outcome before re-running
  • [Phase 5] Fleet registry flip awaits explicit user authorization + timing call
  • [Phase 6] Strengthened ADR-009 validation may reject existing catalog apps — audit manifests before enforcement lands
  • [Global] Live OTA fleet: deploy to the dev pair before any OTA; gate re-runs required after orchestrator changes; some verification is user/hardware-gated (radios, on-device tests)

Deferred Items

Category Item Status Deferred At
Distribution DIST-01 DHT/iroh backbone (workstream D) v2 2026-07-29
Fleet FLEET-01 Bitcoin multi-version fleet OTA (user-gated) v2 2026-07-29
Fleet FLEET-02 per-app deep health assertions (~34 apps) v2 2026-07-29
Fleet FLEET-03 LUKS2 data-partition encryption v2 2026-07-29

Session Continuity

Last session: 2026-07-29 Stopped at: Roadmap + state initialized from ingest; next step is /gsd-plan-phase 1 Resume file: None